|
Every Altronex water
and wastewater control system is thoroughly tested prior to shipping
and installation. Each panel is run through all its paces for several
days - testing every aspect of the control system for function and
reliability.
Altronex
technicians, or your electrical contractor, will perform the installation.
Altronex field service technicians startup the system, train operators,
and make any necessary adjustments to the software configuration
or controllers on site.
Field
services are available on a 24/7 basis. All field technicians
are equipped with laptop computers and diagnostic programs necessary
to troubleshoot your control system.
|